Hazrat Shahjalal International Airport
Hazrat Shahjalal International Airport হযরত শাহ্জালাল আন্তর্জাতিক বিমানবন্দর | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public / military | ||||||||||
Owner | Ministry of Civil Aviation and Tourism | ||||||||||
Operator | Civil Aviation Authority, Bangladesh (CAAB) | ||||||||||
Serves | Dhaka | ||||||||||
Location | Kurmitola, Dhaka-1229, Bangladesh | ||||||||||
Opened | 1981 | ||||||||||
Hub for | |||||||||||
Elevation AMSL | 27 ft / 8 m | ||||||||||
Coordinates | 23°50′34″N 090°24′02″E / 23.84278°N 90.40056°E | ||||||||||
Website | hsia | ||||||||||
Map | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (2019) | |||||||||||
| |||||||||||
Hazrat Shahjalal International Airport (Bengali: হযরত শাহ্জালাল আন্তর্জাতিক বিমানবন্দর, romanized: Hôjôrôt Śāhjālāl Āntôrjātik Bimānbôndôr; IATA: DAC, ICAO: VGHS, formerly VGZR) is the main international airport serving Dhaka City, the capital city of Bangladesh, and it is the largest airport in Bangladesh. It is located in Kurmitola, 17 km (11 mi) from the city centre, in the northern part of Dhaka. The airport is also used as a base for the Bangladesh Air Force, named BAF Base Bangabandhu. The airport has an area of 802 hectares (1,981 acres). The Civil Aviation Authority of Bangladesh (CAAB) operates and maintains the airport. It started operations in 1980, taking over from Tejgaon Airport as the principal international airport of the country. The airport was formerly known as Dacca International Airport and later as Zia International Airport, before being named in honour of Shah Jalal, who is one of the most respected Sufi saints of Bangladesh. The IATA code of the airport, "DAC", is derived from "Dacca", which is the previously used spelling for "Dhaka".
It is the primary hub of most of airlines in Bangladesh including Air Astra, Novoair, US-Bangla Airlines, and the national flag carrier Biman Bangladesh Airlines. The annual passenger handling capacity of the airport is 18.5 million passengers,[3][4] and this passenger handling capacity is predicted by CAAB to be sufficient until 2026.[5] In 2014, the airport handled 9.1 million passengers and 248,000 tonnes of cargo.[6] Average aircraft movement per day is around 190 flights.[7][8] Ground handling at the airport is provided by Biman Ground Handling, which is a wholly owned subsidiary of Biman Bangladesh Airlines.[9] The airport has complete Wi-Fi Internet coverage and all the terminals of the airport have multiple First Class and Business Class executive lounges operated by Five Star hotels, such as Intercontinental Dhaka; Bangladeshi companies such as Eastern Bank Skylounge[10] or City Bank American Express Lounge;[11] as well as local and foreign airlines. Passengers travelling on First Class or Business Class air tickets, as well as economy passengers who are Priority Pass card holders, have complimentary access to select lounges.[12][13]
Location and connectivity
The airport is located in Kurmitola, 11 nautical miles (20.37 kilometres; 12.66 miles) north of downtown Dhaka.[14] It can be accessed by the eight-lane Airport Road.[14] To the north of the airport lies Uttara area and Gazipur city, while Dhaka city lies to its south. There is a railway station immediately outside (facing) the airport named Airport Railway Station.[15][16] Lots of Bangladeshi and international ride sharing and ride hailing apps or companies operate vehicles to and from the airport such as Obhai, Pathao, Shohoz, Uber, etc. There is also a taxi kiosk, located near the exit gate of the international arrivals concourse hall, where one can order a taxi and pre-pay the taxi fare. The airport has been almost engulfed by the city, due to the expansion and development work of real estate companies and the government, prompting the authorities to construct a third terminal and consider building another international airport elsewhere in Dhaka district.[17]
History
In 1941, during the Second World War, the British government built a landing strip at Kurmitola, several kilometres north of Tejgaon, as a spare landing strip for the Tejgaon Airport, which at the time was a military airport, to operate warplanes towards the war fields of Kohima (then in Assam) and Burmese war theatres.[18][unreliable source?][19]
After the creation of Pakistan in 1947, Tejgaon Airport became the first civilian airport in what was then East Pakistan (present day Bangladesh). During the 1965 Indo-Pakistani war, the then abandoned airstrip was bombed by Indian Air Force, thinking it to be the Tejgaon Airport as the base.[20] In 1966, a project was taken by the then Pakistan Government to construct a new airport, and the present site north of Kurmitola was selected. A tender was floated for the construction of the terminal building and the runway under the technical support of French experts. A rail station (present day Airport Railway Station) was also built near the site for the transportation of construction materials. However, the new airstrip was only halfway done when the Bangladesh Liberation War broke out in 1971. During the war, the airstrip suffered severe damage.[citation needed]
After independence, the Government of Bangladesh restarted works abandoned by the previous contractors and consultants during the war. The government decided to make the airport the country's main international airport and appointed Aéroports de Paris of France as its new consultants. The airport began operations in 1980 after the main runway and central portion of the present terminal building was formally opened by then President of Bangladesh Ziaur Rahman as Dacca International Airport ("Dacca" is the former spelling of "Dhaka").[21][22] The project took a further three years to complete, during which time Ziaur Rahman was assassinated in 1981. Thus, after its completion in 1983, then President Abdus Sattar re-inaugurated the airport as Zia International Airport.[23]
In December 1993, Biman Bangladesh Airlines launched a route to New York City via Delhi, Dubai and Amsterdam. The flight was operated by McDonnell Douglas DC-10s.[24] Biman later routed the outbound flight from Dhaka through Dubai and Brussels and the inbound one through Brussels. The company discontinued the service in July 2006.[25] In 2010, the government changed the airport's name once again, from Zia International Airport to the present name of Shahjalal International Airport, in honour of Shah Jalal, one of the most respected Sufi saints of Bangladesh.[26] The airport's ICAO code was also changed to reflect the name change, from VGZR to VGHS.[citation needed]
On 6 December 2011, a Boeing 787-9 (flight ZA006) stopped for refuelling at Shahjalal International Airport during a distance, speed, and endurance record attempt. This aircraft, powered by General Electric GEnx engines, had flown 10,710 nautical miles (19,830 km) non-stop from Boeing Field in Seattle, Washington eastward to Shahjalal International Airport, setting a new world distance record for aircraft in the weight class of the 787, which is between 440,000 pounds (200,000 kg) and 550,000 pounds (250,000 kg). This flight surpassed the previous distance record of 9,127 nautical miles (16,903 km), set in 2002 by an Airbus A330. The Boeing 787 then continued eastbound from Dhaka to return to Boeing Field, setting a world-circling speed record of 42 hours, 27 minutes.[27]
In July 2022, Biman inaugurated a route to Toronto using Boeing 787s. Although the flight from Dhaka to Toronto made a technical stop in Istanbul, the inbound flight was nonstop.[28][29] Four months later, the airline routed the latter via Istanbul as well.[30]
Development and expansion
In 1992, the airport terminal area experienced rapid expansion with addition of boarding bridges and equipment. A multistorey car park with space for 500 cars was also built at this time.[citation needed]
The airport has been set up and upgraded with technology and instruments worth ৳70 million (US$580,000) up to the second quarter of 2012, by the CAAB. They include instrument landing system, distance measuring equipment and flight calibration system, which will help the operational standards of the airport. Two more boarding bridges have been operational, and another is under manufacturing. Asphalt runway overlay began in December 2012 by the Bangladeshi company Abdul Monem Ltd;[31] it took six months to complete. Further improvements in the taxiway and runway lighting system will be made by funds from Danish International Development Agency (DANIDA) worth ৳4.5 billion (US$38 million). Further projects include primary and secondary radar, a new control tower and a modern drainage system.[7][32]
Parking facilities are being upgraded, both for passenger and cargo aircraft, of the airport extension works of passenger and cargo aprons are also going on.[8] The project will cost ৳440 million (US$3.7 million) and will provide facility to park four wide-bodied passenger aircraft and two wide-bodied cargo aircraft side by side.[8] In recent years, CAAB has completed modernisation and beautification of the two terminal buildings, constructed five aircraft parking bays, installed two more boarding bridges, re-installed a power plant to ensure 24 hours power supply, and added more passenger check-in and immigration counters and baggage conveyor belts.[8]
In recent years, the internal designs such as concourse, toilets and other parts were also upgraded. The duty-free shops brought in international luxury branded products. As part of the development plan, the first international chain cafe, Barista Lavazza, was opened in the international terminal in 2014 followed by Krispy Kreme in 2017.
In October 2021, the CAAB entered into an agreement with the French company Thales LAS to construct a new advanced radar system at the airport. Valued at ৳730.13 crore (US$61 million), this system will replace the decades-old existing radar, which lacks the capability to detect all aircraft flying over Bangladesh's airspace, particularly those over the Bay of Bengal. The project aimed at achieving full surveillance of the entire airspace of the country is scheduled to be fully operational by mid-2024.[33]
Development of the third terminal
On 28 December 2019, Prime Minister Sheikh Hasina laid the foundation stone of the third terminal of Hazrat Shahjalal International Airport. The construction work of the third terminal will be done by Aviation Dhaka Consortium (ADC), which comprises Mitsubishi Corporation, Fujita Corporation and Samsung C&T Corporation.[34] The estimated cost of the whole project is ৳21398 crore (US$1.8 billion).[35][36] The terminal building was designed by Singaporean architect Rohani Baharin.[37]
The construction of the new third terminal of the airport will be completed by May 2024.[38] The Japan International Cooperation Agency (JICA) provided the financial assistance of ৳16141 crore (US$1.3 billion) for the project in the form of loans, while the rest of ৳5257 crore (US$440 million) was contributed by the government of Bangladesh. The terminal will cover an area of 542,000 m2 (134 acres), including the passenger terminal with a floor area of roughly 230,000 m2 (2,500,000 sq ft); a 5,900 m2 (64,000 sq ft) square VVIP complex; a 41,200 m2 (443,000 sq ft) cargo building; and multi-level car parking building having a capacity of parking 1,044 cars, with a tunnel. Upon completion of the third terminal, the passenger handling capacity of the airport will increase to 24 million from the current 8 million per annum. 37 aeroplanes can be parked at the terminal at once. Cargo handling capacity will also increase to 500,000 from 200,000 tonnes annually.[39][40] A corridor will also be built to connect the new terminal with the two existing terminals.
Second runway
A feasibility study was conducted to add a parallel, second runway at a cost of ৳10 billion (US$84 million) in 2014.[8] The project was undertaken to cope with rising air traffic, to take pressure off the lone runway, and to double the capacity of the airport. CAAB predicts that the airport's traffic will surpass 10 million passengers and freight. However, 60% of the airport's 2000-acre land remained unutilized in 2014.[41]
In July 2023, CAAB submitted its report to Ministry of Civil Aviation about the possibility of constructing a second dependent runway in the airport due to space constraints. In its report, the CAAB suggested constructing 3,292 m (10,801 ft) long-dependent runway with the existing runway to be extended to 3,692 m (12,113 ft). The new runway will not be used for take-off and landings simultaneously as the proximity between the two runways will be just 359 meters against the ICAO mandated 1,035-meter space needed for ILS-enabled runway. However, the second runway will be mainly used for taxiing or preparing for take-off during busy hours and will be used for take-off and landings in case the main runway remains closed due to an emergency or maintenance. The construction of the second runway is expected to be started after the completion of the third terminal in May 2024.[42]
Terminals
Terminal 1, Terminal 2 and Domestic Terminal
The airport has three major terminals. Terminal 1 (T1) and Terminal 2 (T2) are for international flights, and they are located in the same building. T1, on the ground floor, is used as the international arrivals concourse hall. T2, on the upper floor, serves as the international departures concourse hall. A third adjacent terminal building, known as the Domestic Terminal, is for domestic flights. This is located to the left of the international terminals. In the one-storey Domestic Terminal, both the arrivals concourse hall and the departures concourse hall are on the same floor.
Terminal 3
Construction of the third terminal started in December 2019 and is still under construction.[8][38] According to the project design, the facilities of the terminal includes, 26 boarding bridges of which 12 will be built in the first phase and additional 14 bridges will be built at a later phase, 16 conveyor belts, 115 check-in counters including 15 self-check-in kiosks, 64 departure immigration desks, 59 arrival immigration, 3 VIP immigration desks and 10 automated 'e-gates' at the exit. For passengers' convenience there will be 12 walkalators, 35 escalators, and 43 elevators.[43][44]
On 7 October 2023, the terminal was partially inaugurated, with 90 percent physical work being done, by Prime Minister Sheikh Hasina and the terminal was expected to be fully operational by October 2024.[45][46] However, due to delays in decision making regarding issues like logistics, ground handling, training, system calibration etc., Terminal 3 is expected to enter into operation mid 2025, by June or July.[47]
VIP terminal
A VIP terminal building is located to the right of the international terminals. The VIP terminal is built only about 200 metres (220 yards) from the main gate. However to make way for the construction of the new third terminal, the demolition of the VIP Terminal commenced in April 2023. A temporary terminal has been constructed to provide VIP services, and the VIP services will be shifted to the Third Terminal in the future.[48]
Cargo terminal
There is a cargo terminal at the airport which has a capacity of 200,000 tons per annum. This will be increased to 500,000 tons after the completion of the ongoing renovation and expansion project.[49]
Airlines and destinations
Passenger
^1 : Biman Bangladesh Airlines's flight from Dhaka to Toronto and vice versa makes a technical stop at Istanbul for refueling and crew change. Biman Bangladesh does not carry passengers solely from Dhaka to Istanbul, nor does the airline have fifth freedom rights to fly passengers from Istanbul to Toronto.[84]
Cargo
Accidents and incidents
- On 28 September 1977, a Japan Airlines Flight 472 en route from Mumbai to Tokyo was hijacked by five Japanese Red Army terrorists shortly after takeoff, and forced the plane to land at then Zia International Airport.[87] The terrorists' demand of $6 million and release of 6 JRA terrorists from Japanese prison was met by the Japanese Prime Minister.[88] Bangladesh Air Force was deployed to control the situation in the ground and to facilitate negotiations.[87]
- On 5 August 1984, a Biman Bangladesh Airlines flight from Chittagong crashed in the swamps near Zia International Airport. All 45 passengers and 4 crew of the Fokker F27 died, making it the worst aviation disaster of Bangladesh.[89]
References
- ^ "Aerodrome Information: Hazrat Shahjalal International Airport, Dhaka". Civil Aviation Authority, Bangladesh. Archived from the original on 10 March 2009. Retrieved 27 December 2008.
- ^ "Aerodrome Information: Hazrat Shahjalal International Airport, Dhaka (continued)". Civil Aviation Authority, Bangladesh. Archived from the original on 10 March 2009. Retrieved 27 December 2008.
- ^ Ahmad, Rashiduddin (29 September 2010). "New airport at Trishal: Flight of fancy or urban nightmare?". The Daily Star. Retrieved 15 November 2011.
- ^ Byron, Rejaul Karim (28 August 2010). "New int'l airport to cost Tk 50,000cr". The Daily Star. Retrieved 16 November 2011.
- ^ "Airport Development History". Civil Aviation Authority, Bangladesh. Retrieved 16 November 2011.
- ^ "CAAB initiates efforts to expand and upgrade HSIA To build a new airport for Dhaka". The Bangladesh Monitor. 1 April 2015. Archived from the original on 5 April 2015.
- ^ a b "Shahjalal airport set for upgrade in two months". The Daily Star. Retrieved 4 June 2015.
- ^ a b c d e f "CAAB initiates efforts to expand, upgrade HSIA to elevate its international standing". The Bangladesh Monitor. 1 July 2013. Archived from the original on 11 December 2015. Retrieved 21 July 2013.
- ^ "Ground Handling". Biman Bangladesh Airlines. Archived from the original on 7 August 2013. Retrieved 1 February 2014.
- ^ "Eastern Bank Ltd. Skylounge". www.ebl.com.bd. Archived from the original on 1 March 2021.
- ^ "City Bank opens City Bank American Express Lounge at Dhaka airport". TheIndependentbd.com. 4 November 2020. Archived from the original on 16 January 2021.
- ^ "Executive Lounges in Bangladesh". Archived from the original on 2 December 2021.
- ^ "Airport Lounges". Archived from the original on 7 May 2021.
- ^ a b "Dhaka – Airports". World Executive. Archived from the original on 24 April 2013. Retrieved 15 November 2011.
- ^ "From Sylhet to Dhaka Airport by train". Retrieved 4 June 2015.
- ^ Dhaka Airport Road. Google Maps.
- ^ Asif Showkat Kallol; Ishtiaq Husain (5 August 2016). "Bangabandhu Sheikh Mujib International Airport construction to begin in 2018". Dhaka Tribune. Archived from the original on 2 January 2019.
- ^ Ahmed, Ershad (16 November 2006). "Zia International Airport, Dhaka".
- ^ Uddin, Syed Mohd Saleh (2012). "Airports". In Islam, Sirajul; Jamal, Ahmed A. (eds.). Banglapedia: National Encyclopedia of Bangladesh (Second ed.). Asiatic Society of Bangladesh.
- ^ "triumph in the east". PakDef.info. Archived from the original on 13 June 2011.
- ^ "Dhaka". 16 November 2006. Retrieved 4 June 2015.
- ^ Dhaka City :: everything about our city
- ^ "ZIA made Shahjalal International Airport". The Daily Star. Retrieved 4 June 2015.
- ^ Dahlburg, John-Thor (26 December 1993). "News, Tips & Bargains If You've Seen It All, How About Bangladesh?". Los Angeles Times. ProQuest 282156409.
- ^ "Biman makes its last flight to NY today". The Daily Star. 29 July 2006. Retrieved 28 September 2013.
- ^ "ZIA made Shahjalal International Airport". The Daily Star. 16 February 2010. Retrieved 16 November 2011.
- ^ "Boeing". Retrieved 4 June 2015.
- ^ "YYZ welcomes Biman Bangladesh inaugural flight". Toronto Pearson. 27 July 2022. Retrieved 3 September 2022.
- ^ Hasan, Rashidul (27 July 2022). "Despite huge hype, Biman's first Toronto flight half empty". The Daily Star. Retrieved 3 September 2022.
- ^ "Biman NW22 Toronto Routing Adjustment". Aeroroutes. 31 October 2022. Retrieved 16 May 2023.
- ^ Abdul Monem Ltd
- ^ "Runway rebuilding work begins at Shahjalal airport". The Daily Star. Retrieved 4 June 2015.
- ^ Hasan, Rashidul (19 April 2023). "Dhaka airport to get better eyes in the skies". The Daily Star. Retrieved 28 March 2024.
- ^ Karim, Rejaul; Hasan, Rashidul (7 November 2019). "Shahjalal Int'l Airport: Third terminal now to cost 40pc more". The Daily Star. Retrieved 28 December 2019.
- ^ নিয়ম না মানলে বিমানে চড়াই বন্ধ: প্রধানমন্ত্রী. Prothom Alo (in Bengali). BSS. Retrieved 28 December 2019.
- ^ "PM inaugurates construction of Dhaka airport's 3rd terminal". Dhaka Tribune. 28 December 2019. Retrieved 28 December 2019.
- ^ "Dhaka airport's third terminal at a glance". The Daily Star. 7 October 2023. Retrieved 21 October 2023.
- ^ a b "Dhaka Airport 3rd terminal 51% complete: CAAB Chairman". The Daily Star. 27 November 2022. Retrieved 14 February 2023.
- ^ "Work order for HSIA's 3rd terminal by July: CAAB chairman". New Age. Retrieved 8 May 2019.
- ^ "Tender for 3rd terminal at HSIA next month". The Independent. Archived from the original on 31 August 2018. Retrieved 8 May 2019.
- ^ "Feasibility study on 2nd runway at HSIA by June next year". The Financial Express. 24 May 2012. Retrieved 6 September 2012.
- ^ Hasan, Rashidul (17 September 2023). "Dhaka airport to finally get a second runway". The Daily Star. Retrieved 3 October 2023.
- ^ "Connecting dreams to reality: PM opens airport's Terminal 3 today". The Business Standard. 7 October 2023. Retrieved 21 October 2023.
- ^ "Third terminal to be inaugurated today, what does it offer?". Prothom Alo. 7 October 2023. Retrieved 21 October 2023.
- ^ "New era begins as PM opens Dhaka airport 3rd terminal". The Business Standard. 7 October 2023. Retrieved 21 October 2023.
- ^ "Dhaka airport 3rd terminal set for full operation in October". The Business Standard. 28 February 2024. Retrieved 29 February 2024.
- ^ "Dhaka airport third terminal nears completion, final touches underway". Dhaka Tribune. 8 October 2024. Retrieved 10 October 2024.
- ^ Tribune Desk (14 April 2023). "Demolition of Dhaka airport VVIP terminal starts". Dhaka Tribune. Retrieved 21 September 2024.
- ^ Shohel Mamun (6 May 2021). "Dhaka airport third terminal gets new features". Dhaka Tribune. Archived from the original on 19 August 2021.
- ^ Liu, Jim. "Air Arabia Abu Dhabi plans Dhaka / Kabul launch in early-August 2020". Routesonline.
- ^ "Air Astra kicks off domestic flights today". The Business Standard. 24 November 2022.
- ^ "Air China Adds Beijing – Dhaka Service from July 2024". Aeroroutes. Retrieved 14 June 2024.
- ^ "AIR INDIA RESUMES DELHI – DHAKA SERVICE FROM SEP 2023". Aeroroutes. Retrieved 31 July 2023.
- ^ "Air India Express launches direct flights to Dhaka from Chennai and Kolkata". The Economic Times. 31 July 2024. Retrieved 31 July 2024.
- ^ "Air Premia Adds Bangladesh Scheduled Charters From July 2023". AeroRoutes. 18 May 2023. Retrieved 18 May 2023.
- ^ "AIR PREMIA MOVES DHAKA SERVICE LAUNCH TO OCT 2023". aeroroutes.com. 8 September 2023.
- ^ "Biman to start Dhaka-Chennai direct flight from December 16". Dhaka Tribune. 16 November 2023. Retrieved 17 November 2023.
- ^ "Biman Bangladesh Airlines Resumes Guangzhou Service From mid-Sep 2023". Aeroroutes. Retrieved 10 August 2023.
- ^ "Biman Bangladesh Airlines Resumes Rome Service in late-1Q24". Aeroroutes. Retrieved 15 February 2024.
- ^ "Biman to start operating flights to Japan from September 1". Dhaka Tribune. 21 May 2023. Retrieved 28 June 2023.
- ^ "Biman Bangladesh Begins Regular Toronto Service in Late July 2022". Aeroroutes. Retrieved 27 June 2022.
- ^ "Flight Schedule -Biman Bangladesh". www.biman-airlines.com. Retrieved 11 January 2020.
- ^ "Cathay Pacific NW22 Preliminary Network Overview - 13MAY22". Retrieved 9 September 2022.
- ^ "Dhaka adds new routes; Tokyo, Seoul, Shanghai key route opportunities". 19 March 2020.
- ^ "China Southern Tentatively Moves Beijing - Dhaka Launch to Mid-May 2024". Aeroroutes. Retrieved 17 April 2024.
- ^ "China Southern Boosts Bangladesh Service in NS24". Aeroroutes. Retrieved 6 February 2024.
- ^ "Drukair Plans Dhaka – Bangkok Sector Resumption From March 2023". Aeroroutes. Retrieved 2 November 2022.
- ^ "AACO | EgyptAir launches Cairo-Dhaka service".
- ^ "Ethiopian airlines Dhaka-Addis Ababa flight from Mar 8". Retrieved 12 December 2023.
- ^ "Sri Lanka's FitsAir launches direct flights to Dhaka". The Business Standard. 22 March 2024.
- ^ "flydubai resumes flights to Almaty, Dhaka, Djibouti, Kuwait and Nursultan". Flydubai. Retrieved 1 November 2021.
- ^ "Himalaya Airlines direct flight to dhaka". The Himalayan Times. 12 July 2019. Retrieved 16 July 2019.
- ^ "Indigo New Flights". goindigo.in.
- ^ "INDIGO PLANS BANGLADESH SERVICE EXPANSION FROM LATE-OCT 2022". Aeroroutes. Retrieved 12 September 2022.
- ^ "Jazeera Airways launches Kuwait - Dhaka". anna.aero. 2 October 2020. Retrieved 1 November 2021.
- ^ "MAI to expand Chiang Mai, Vientiane, Dhaka flights in April - Global New Light of Myanmar". 10 March 2024.
- ^ চট্টগ্রাম ও বরিশালে ফ্লাইট বাড়াল নভোএয়ার. Prothom Alo (in Bengali). Retrieved 29 December 2019.
- ^ "Oman Air resumes Chattogram-Muscat flight after 4 months". The Business Standard. 4 September 2021. Retrieved 1 November 2021.
- ^ "Thai AirAsia Adds Bangladesh Service from late-Nov 2022".
- ^ "Thai Lion Air adds Dhaka service from Oct 2018".
- ^ "US-Bangla Airlines to kick off flights to Abu Dhabi". Bdnews24.com. 5 March 2024. Retrieved 5 March 2024.
- ^ "US-Bangla Airlines Schedules Dhaka – Jeddah August 2024 Launch". Aeroroutes. Retrieved 13 May 2024.
- ^ "US-Bangla Airlines to start flights on Dhaka-Sharjah route from Jan 30". New Age. Retrieved 27 January 2022.
- ^ "Biman NW22 Toronto Routing Adjustment". AeroRoutes. 31 October 2022. Retrieved 31 October 2022.
- ^ "Easy Fly Express routes". Easy Fly Express.
- ^ "Sky Capital Cargo destinations". Skycapitalcargo.com.
- ^ a b "JAL 1977 plane hijack in Dhaka: Japanese filmmaker to make documentary". bdnews24.com. Retrieved 15 November 2011.
- ^ "Japanese Red Army member's life sentence to stand". Japan Times. 15 September 2011. Retrieved 15 November 2011.
- ^ "49 Die in Bangladesh As Plane Plunges". The New York Times. Reuters. 4 August 1984. Retrieved 23 January 2008.
External links
- Civil Aviation Authority, Bangladesh: Airports Archived 29 September 2007 at the Wayback Machine